Bradley Tech High School, Milwaukee, WI
|
When MPS decided to raze the old school building and convert the
land to a football field, it was time to address all the materials
that were left in the school when the students moved to the new
school. REID was hired to clean all three floors of all materials.
Debris included desks, books, wood, machine rooms, etc. It took
approximately 3 months to completely remove all the debris.
|
Bradley Tech High School
|
Wood Working Room
Wood Shop where the wood was left when the school was closed down.
All the wood had to be hauled down three floors and then disposed of.
REID hired COIN students (people seeking training so they can earn
a career) to work along side our employees and learn the value of a
great job and how hard it is to work on a construction site.
|
|
 |
|